FM44-80
PROCEDURES AND DRILLS FOR THE NIKE 1 SYSTEMPlease note: pages 1-5 were missing in the reproductions received from the government.
Part One ORGANIZATION AND EQUIPMENT Paragraphs Pages CHAPTER 1. INTRODUCTION 1-14 3 2. FIRE CONTROL AND LAUNCHING EQUIPMENT Section I. Battery control area equipment 15-23 10 II. Launching area 24-33 64 Chapter 3. HANDLING, SERVICING AND. TEST EQUIPMENT Section I. Missile and booster 34-46 91 II. Propellant servicing equipment ¢7-49 106 III. Test equipment 50-59 115 IV. Miscellaneous 60-63 126 Chapter 4. ENGINE GENERATORS Section I. Description and data 64-69 131 II. Operation 70-80 135 Chapter 5. CABLES AND COMMUNICATIONS Section I. Cables 81-94 149 II. Communications 95-108 148 Chapter 6. OPERATION OF HEATING AND VentilatING SYSTEMS Section I. Equipment-cooling system 109-111 151 II. Personnel heating and ventilating-system 112-117 154 Chapter 7. RECORDING SYSTEMS Section I. General 118,119 164 II. Plotting boards 120-125 164 III. Event recorder 126-134 167 IV. Photographic processing machine 135-140 174 PART Two. OPERATIONAL CHECKS - Chapter 8. BATTERY CONTROL AREA Section I. Requirements 141-145 178 II. Daily system checks 146-151 179 III. Daily target and missile radar checks 152-171 184 IV. Daily acquisition radar and computer checks 172-177 194 V. Initial, weekly, and monthly checks 178-179 196 VI. Prefiring checks 180-189 196 VII. Computer dynamic test 190-198 ° 213 VIII. Training and tracking tests 199-206 220 CHAPTER 9. LAUNCHING AREA Section I. Launching control trailer 207 225 II. Daily checks 208-209 225 III. Weekly checks 210-222 226 IV. Special checks 223-225 232 V. Monthly checks 226-229 233 CHAPTER 10. MISSILE AND BOOSTER PREPARATION Section I. Responsibility 230, 231 241 II. Assembly 232-242 241 III. Check 243-250 258 IV. Propellant servicing 251-282.7 285 V. Explosive components 283-292 229 VI. Loading and unloading transporter-trailer 293-296 329 Chapter 11. EMERGENCY PROCEDURES (MISSILE AND BOOSTER) Section I. Personnel 297-299 340 II. Booster igniter, arming mechanisms, and battery box. 300-309 341 III. Propellant removal 310-316 344 section 1. Undergrounu storage magazine-type installations. 344-355 377 II. Aboveground launching sections 356-366 389 CHAPTER 15. EMERGENCY FIRING PROCEDURE 367-373 395 PART FOUR. EMPLACEMENT AND MARCH ORDER CHAPTER 16. SEQUENCE 374-376 406 17. BATTERY CONTROL AREA Section I. General 377-381 407 II. Acquisition radar and maintenance and spares trailer. 382-395 407 III. Battery control trailer and radar control trailer 396-407 420 IV. Missile-tracking radar, target-tracking radar, and
radar collimation mast assembly408-420 426 CHAPTER 18. LAUNCHING AREA Section I. Launching control trailer 421-433 445 II. Launching section control equipment 434-444 449 III. Launcher-loader assemblies 445-459 450 CHAPTER 19. ASSEMBLY AREA 460-470 460 20. ORGANIZATIONAI. MAINTE:v'ANCE OF EQUIPM1ENT 471,472 465 APPENDIX I. REFERENCES - 469 II. DESTRUCTION OF MATERIEL _ 470 III. GLOSSARY AND ABBREVIATIONS _ 471 Index - - 473