| Paragraphs | Pages
PART ONE. ASSEMBLY AND SERVICE OPERATIONS
CHAPTER 1. INTRODUCTION | 1-1-1-11 | 1-1-1- 2
| CHAPTER 2. PARTS, TOOLS, AND EQUIPMENT
Section I. Parts, common tools, and equipment 2~1-2-3 | 2-1
| II. Special tools and equipment and fabricated tools 2-4-2-5 | 2-1-2-3
| CHAPTER 3. ASSEMBLY OF THE MISSILE FOR ELECTRICAL
CHECKOUT
Section I. General 3-1-3-3.1 | 3-1--3-$
| II. Inspection of containers 3-4, 3-5 | 3-8
| III. Uncrating and assembling the missile 3-6-3-14 | 3-8-8-33
| CHAPTER 4. AIR AND OIL SERVICING AND MISSILE ELECTRICAL
CHECKOUT
Section I. Air and oil servicing the accessory power supply (APS) 4-,1-4-7 | 4-1-4-8
| II. Air and oil servicing the hydraulic pumping unit (HPU) 4-8-4-11 | 4-25,4-26
| III. Missile electrical checkout 4-12-4-16 | 4-43-4-73
| IV. Fuel servicing and operational test (hot-run) of the accessory
power supply (APS) 4-17--4-19 | 4-74-4-80
| CHAPTER 5. UNCRATING AND INSTALLING THE MISSILE ROCKET
MOTOR ASSEMBLY
Section I. Preliminary procedures 1 | 5-1-5-4.1
| II. Uncrating the missile rocket motor subassembly 5-7,5-8 | 5--6-5-7
| III. Installation of the missile rocket motor subassembly 5-9, 5-10 | 5-12-5-14
| CHAPTER 6. UNCRATING AND INSTALLING THE WARHEAD BODY
SECTION 6--1-6-3 | 6-1-6-4
| CHAPTER 7. FINAL PREPARATION OF THE WARHEAD BODY SECTION
AND THE FORWARD BODY SECTION
Section I. Electrical cable connections 7-1-711 | 7-1-7-3
| II. Installation of the forward main fin and the forward body
section __ 7-5-7-10 | 7-7-7-16
| III. Installation of the rear roll ring 7-11,7-12 | 7-17-7-18
| CHAPTER 8. ASSEMBLY OF THE ROCKET MOTOR ASSEMBLY | 8-1$9 | 8-1-8-22
| CHAPTER 9. JOINING PROCEDURES FOR THE MISSILE BODY AND
ROCKET MOTOR CLUSTER
Section 1. Transporting the missile body and the rocket motor cluster to
the launching area 9-1,9-2 | 9-1-9-4
| II. Joining the missile body and the rocket motor cluster on the
launching-handling rail 9-4--9-8 | 9-8-9-16
| CHAPTER 10. FINAL PREPARATION OF THE MISSILE | 10-1-10-6 | 10-1-10-17
| PART TWO. DEACTIVATION, CORRECTIVE MAINTENANCE, AND
STORAGE
| CHAPTER 11. NORMAL DEACTIVATION PROCEDURES
Section 1. General 11-1-11-3 | 11-1
| 11. Preliminary procedures 11-4---11-7 | 11-1-11-4
| III. Removal of the missile from the launching area, using guided
missile low-bed trailer M529 11-8,11-9 | 11-5
| IV. Removal of the missile body from the launching-handling rail 11-10-11-11 | 11-6-1.1-7
| V. Removal of the rocket motor cluster from the launching-
handling rail 11-12,11-13 | 11-8
| VI. Removal of the forward body section 11-14,11-15 | 11-9
| VII. Removal of the forward main fins and preparation for removal
of the warhead body section 11-16-11-19 | 11-10, 11-11
| VIII. Removal of the warhead body section 11-20-11-22 11-11,11-12
| IX. Removal of the missile rocket motor subassembly 11-23-11-26 | 11-13-11-15
| X. Defueling, depressurizing, and purging the .accessory power
supply (APS) 11-27-11-31 | 11-16-11-18
| XI. Removing and packaging the main fins and the elevons 11-32--11-34 | 11-20
| XII. Preparation of the forward and rear body sections for shipment
or storage 11-35-11-37 | 11-21,11-22
| CHAPTER 12. CORRECTIVE MAINTENANCE
Section I. General 12-1-12-3 | 12-1-12--6
| II. Corrective maintenance of the missile guidance set
(MUSHROOM) 12-4-12-21 | 12-7-12-25
| Ill. Corrective maintenance of the missile guidance set
(STOVEPIPE) 12-21.1-12-46 | 12-25-12-45
| IV. Corrective maintenance of the forward body section 12-47-12-55 | 12-45-12-50
| V. Corrective maintenance of the warhead body section 12-56-12-60 | 12-51-12-54
| VI. Corrective maintenance of the missile motor section 12-61-12-64 | 12-55,12-56
| VII. Corrective maintenance of the equipment section 12-65--12-68 | 12-56-12-58
| VIII. Corrective maintenance of the accessory power supply (APS)
and the hydraulic pumping unit (HPU) 12-69--12-73 | 12-59-12-69
| IX. Accessory power supply (APS) servicing system cleanup-
launching area 12-74-12-79 | 12-70-12-76
| X. Hydraulic pumping unit (HPU) servicing and system
cleanup-launching area 12-80-12-84 | 12-81-12-84
| XI. Corrective maintenance of the actuator section 12-85--,12-87 | 12-86,12-87
| XII. Corrective maintenance of main fins and elevons 12-88-12-90 | 12-90,12-91
| XIII Corrective maintenance of the shipping and storage containers 12-91-12-99 | 12-91-12-96
| XIV. Corrective maintenance of the rocket motor cluster 12-100-12-117 | 12-96-12-103
| CHAPTER 13. WINTERIZATION INSTRUCTIONS
Section I. General 13-1-13-4 | 13-1-13-3
| II. Rocket motor cluster winterization kit 13-5-13-20 | 13-6-13-22
| III. APS and battery box winterization kit 13-21-13-24 | 13-22-13-25
| IV. Corrective maintenance of winterization kits 13-25-13-27 | 13-26-13-27
| CHAPTER 14. NIKE-HERCULES GUIDED MISSILE TRAINING BODY
SECTION M84
Section I. General 14-1,14-2 | 14-1
| II. Physical description 14-3-14-8 | 14-1-14-3
| III. Shipment, inspection, and uncrating 14-9-14-15 | 14-8-14-14
| IV. Assembly procedures 14-16-14-26 | 14-14-14-16
| V. Disassembly procedures 14-27-14-37 | 14-16,14-17
| VI. Corrective maintenance 14-38-14-41 | 14-18
| CHAPTER 15. HANDLING, SHIPMENT, AND LIMITED STORAGE
Section I. General 15-1-15-4 | 15-1,15-2
| II. Shipment 16-5-15-7 | 15-2-15-5
| III. Limited storage 15-8-15-18 | 15-7-15-12
| IV. torque requirements 15-19-15-21 | 15-14
| APPENDIX A. BASIC ISSUE ITEMS LIST | A-1-A-5 | A-1-A-8
| INDEX | | 1
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |